0%

SANS XA

SANS XA COMPLIANCE WORKSPACE

This page provides a live prescriptive-style checker for the envelope items that can be automated quickly. It compares your inputs against editable benchmark thresholds and keeps the roof, glazing, and hot-water checks live.

Benchmarks are prefilled from publicly available SANS XA guidance and project examples. Confirm final values against the submitted plan tables and the applicable edition of the standard.
Compliance route Prescriptive check
Overall status Awaiting inputs
Pass rate 0%
Pass balance 0 / 0

Project Data

Assembly Values

Benchmark Targets

Glazing ratio 0%
North glazing ratio 0%
Roof reserve 0.00 m2K/W
Solar gain index 0.00
Wall reserve 0.00 m2K/W
Roof factor 0.00x
Wall factor 0.00x
Storeys 1
Hot-water split 0 / 0 kWh
Hot water compliance 0 / 0 kWh

Automated Checks

Envelope Snapshot

What this checks automatically

Roof and wall resistance, glazing ratio, north-facing glazing ratio, hot-water contribution, and a quick glazing conductance and SHGC comparison.

Project review items

Final plan approval, exact climate-zone tables, storey-specific conductance limits, and any rational assessment route that replaces the prescriptive checks.

Standards basis

Prescriptive values are aligned to public SANS 10400-XA guidance and common plan-review outputs. The page keeps the assumptions editable so the final project tables can replace them where needed.

Hot water At least 50% of annual average hot water demand should be met by non-resistance means.
Roof / ceiling Zone-based roof resistance is benchmarked from the public guidance set and prefilled at 3.7 for the zone preset.
Fenestration Glazing ratio, U-value, SHGC, and north-facing glazing stay editable because they vary by building type and route.